New product
Warning: Last items in stock!
Availability date:
This recommended practice covers all of the major components that comprise a standard electric submersible pumping system, their operation, maintenance, and troubleshooting. It is specifically prepared for installations in oil and water producing wells where the equipment is installed on tubing. It is not prepared for equipment selection or application.
Author | API |
---|---|
Editor | API |
Document type | Standard |
Format | File |
Confirmation date | 2013-10-01 |
ICS | 75.180.10 : Exploratory, drilling and extraction equipment
|
Number of pages | 23 |
Replace | API RP 11S (1982-01) |
Cross references | GB/T 17387 (1998), IDT |
Year | 1990 |
Document history | API RP 11S (1994-11) |
Country | USA |
Keyword | API 11S;11S |